The water from Well 2 (our Plan B supply), is slightly acidic. This makes it taste nice but the hot water cylinder (heated with water from the solar thermal panels and showing a cylinder temperature of 59 degrees in March!), needs to be made of stainless steel and all the pipe work has to be poly-plastic, as conventional, neat copper pipes would corrode. The red cylinder is the pressure vessel, which smooths out the waveform produced by the submersible pump in the well.
We'd been looking forward to this moment and yes, this first firing showed that the wood-burner draws really well, using its own air supply ducted straight into the base of the fire, through the wall. The top of this duct looks like something in tellytubby land and we'll have to make sure it doesn't get blocked by snowdrifts. The stainless steel flue brackets look really lovely.
Jim the hedger, mulching the newly planted trees. The mixture of native species will take a few years to fill out but we are determined to re-establish a proper hedge boundary, here and to the northwest of the house. The old hedges had decayed and been neglected for years. Where parts could be saved, Jim and Dougie "steeped" them, which in Gloucestershire is called "laying" a hedge.
Someone else has commented that this view is almost ecclesiastical, which is what we think, too.
And suddenly, we have a driveway, levelish and wide enough to build a garage, when we can afford to. The cut-off wooden posts are to stop cars from rolling down the bank.
The next visit, we hope, will be for the formal handover of the house. It is exactly a year this week since the first building work started.