At a site meeting in mid January, we were distracted from the business in hand by the arrival on site of the new windows as well as the oak flooring. It was difficult to concentrate with this going on just outside the site hut windows. However, we accomplished a huge amount at the meeting and I learned what a "floating floor" is.
The builders seemed genuinely pleased to be installing glazed windows that actually fit the holes and by the end of the winter's afternoon, they had several of the big gable ends done. Just before the meeting started, an earnest chap from the blinds company turned up unexpectedly. He was much more experienced than the greenhorn who'd assured us that the company could fit the pleated blinds within the window reveals. They cannot. We will see what can be done when we go down next week.
Another photo I almost didn't include. Peter has had a clear vision of what the shower enclosure should look like, right from the start (in fact the whole room's been planned around two gorgeous glass bowls we bought 4 years ago) and we ordered the shower screens and tray on line, to create the finish we wanted. What we didn't appreciate (that'll teach us to read the teeny tiny print) was that the screens are designed to be fitted in a wet room. Our en suite is not a wet room and will have an oak floor. It's taken the combined ingenuity of the whole team, including Peter and me, to work out how to adapt the component parts and avoid water escaping under the floorboards. Fingers crossed.
One of the longest running conundrums has been how we can stop the gravel on the drive migrating to the bottom of the slope. We've researched it exhaustively and had decided on a grid network filled with gravel. Then the planning permission was checked and the answer is that we can't do anything that may affect the oak tree roots. It's back to raking the gravel back up the slope.