We've been given a CD of photos taken by the contractors, which is a great record of work that we missed. This is Joe, the site manager, at the bottom of pumped-out Well 1.Sunday, 20 December 2009
In the beginning was a hole
We've been given a CD of photos taken by the contractors, which is a great record of work that we missed. This is Joe, the site manager, at the bottom of pumped-out Well 1.Sunday, 1 November 2009
So much happening
Welcome to Greenwood. It's nearly weather-tight and there has been huge progress. We were feeling rather overwhelmed by it all and then the stair plans arrived and blew our minds entirely; in a good way, I hasten to add. We've been repeating what we want until it has felt like a mantra and suddenly, there it is, realised in 3-D and colour. There will be a steel frame set up and from this will be hung the inner end of the oak treads. They won't touch the outer curve and will appear to float. The steelwork wil be concealed within a plastered wall. It is exactly what we'd planned and will be fabricated by a firm in Barnstaple.
Building sites are always bewildering and cluttered. This will eventually be a generous, oak -floored gallery opening out from the entrance lobby. It will have a glass balustrade, giving a view down into the living room. The glass will run along to the top of the stairwell, too, shown guarded by a steel fence, to the right. The view southwards, from the sliding door to the balcony should be spectacular as well. And the correct door slides open, the one on the left, not the one opening into the void!
This photo also shows the conjunction of roof structures that exercised us so mightily just a few weeks ago. It'll be fine.
First fix electrics are well under way and here the kitchen wiring is being planned in detail. So many decisoions to make just for this one area.
Slating is nearing completion and the fixings for the solar photovoltaic panels are in place. This will generate about 1.8Kwh in daylight hours and will provide most of our electricity needs. We'll put more panels on the south-facing pitch of the garage we intend to build once the house is finished. We could put more, free-standing ones on the slope below the house, but we'll see whether we need them and also, what technological developments arrive in the next few years. At the moment, we both rather fancy a helical wind-generator, such as the one on the new Colston Hall extension in Bristol.
A rather more prosaic and traditional energy technology here. We've always intended to have a woodburner and because the house is so well insulated, we won't need any supplementary heating. In the beginning, we'd planned under-floor heating; a warm water system, heated by a ground source heat-pump. However, the mechanical engineer convinced us that this would be uneccessary, so we spent the money on photovoltaics instead. And as anyone who's ever used a log fire knows, you are warmed twice at least, in the cutting and carting the logs, before they reach the fire. Yeah, right. Me. I'm inclined to pay someone else to do that bit. We'll build a wood-store in a sunny spot against the north-west boundary hedge.
Thursday, 22 October 2009
Window problems (as always with grand designs)
What a beautiful, tranquil scene. However, a few days before this photo was taken, we'd discovered that several (possibly all) of the triangular windows that frame the sliding doors or fill the gable ends were the wrong shape and size. It has meant re-ordering them from the manufacturers in Latvia and a significant delay to some of the work, both inside and out. Those of you who watch the TV Grand Designs will be familiar with this point in most of the projects filmed. Tedious.
This is our bedroom, in a photo taken a couple of weeks earlier than the one above. It shows the sliding door unit still shrouded in heavy duty polythene. The triangular spaces will eventually be filled with correctly fitting, triple-glazing.
The roof has been heavily felted and battened and the slating is about to begin.
This view, from the west, shows where there will be a large triangle of glazing in the gable end. The yellow pipe crossing the photo is leading from Well 1. We've asked that it should be pumped out several times and if the contaminants are reduced sufficiently, we'll use the water for the garden in due course.
This is bedroom 3 and it, too, has a glazed gable end that will have to wait. It's at the north side of the house so we've put two Velux windows in here. The rectangular window below is a mandatory fire exit from this part of the house; we hadn't planned to have a window at this level.
This photo, from within our bedroom, shows a further problem that was revealed once the polythene was removed from the sliding doors. Only one side slides open; the other is fixed. From the drawings, we'd assured ourselves that the sliding door would be the one on the right, so that we can lie in bed and watch the sun come up, or stroll out and have breakfast on the balcony. Hah! The opening door is on the left, so not only would we have to squeeze past the end of the bath (did I mention the beautiful bath we have planned for this room?) but we'd have to leave the table at the other end of the balcony, obstructing our view across the valley. Smallish points, really, in the greater scheme of things. However, as there is a big order going in to the company, we've asked them to replace this unit. It won't add to the inevitable delay.
Wednesday, 7 October 2009
Let there be light
When the place was first designed, the site was perceived, accurately, as very tight and precipitously steep. Thus, the high walls at the front of the south-facing terrace were planned to stop people falling off and tumbling down the hillside, head over heels.
Since the work has started, it's become very clear that the ground can be "sculpted" by determined men with big digger-type machines. The builders have levelled a useful area around the house to give themselves room to work and to stand the scaffolding. Once we realised that the ground can safely be levelled, we decided to do away with these walls, to extend the terrace a bit and to open up the view from the ground floor again.
The terrace won't be load-bearing, so it shouldn't need sturdy foundations and we plan to make a 45 degree slope down to the next terrace. On this slope we'll plant grass and wild-flowers. The soil will be poor quality, mostly stony brash, which will suit wild flowers.
Since the work has started, it's become very clear that the ground can be "sculpted" by determined men with big digger-type machines. The builders have levelled a useful area around the house to give themselves room to work and to stand the scaffolding. Once we realised that the ground can safely be levelled, we decided to do away with these walls, to extend the terrace a bit and to open up the view from the ground floor again.
The terrace won't be load-bearing, so it shouldn't need sturdy foundations and we plan to make a 45 degree slope down to the next terrace. On this slope we'll plant grass and wild-flowers. The soil will be poor quality, mostly stony brash, which will suit wild flowers.
Monday, 28 September 2009
Sewage is so sexy!
This is another of the newly levelled terraces, created for the burying of the sewage treatment plant. The old septic tank was deemed too small for a modern 3 bedroom house, so we decided to put this beast at the other side of the site, accessible across our own land, rather than via the neighbour's private drive. It is an active system, using aerobic breakdown by bacteria, to give a clear (but bacteria-laden) outflow, which will discharge into the stream at the boundary. We had to apply for a "Licence to Discharge" from the Environment Agency.
Tuesday, 22 September 2009
Just run that past me again...
At a site meeting in September, we noticed that the entrance lobby roof ridge appeared to be balanced on a cross-beam running across the gallery, a few feet inside the front door. To our surprise and concern, it looked as if this cross beam would bisect the open, wide, lofty space we plan. We'd asked for a modification in the orientation of this entrance a couple of years ago and hadn't seen an elevation or cross-section of how it would work. It's exactly at the point where the east-west and north-south axes of the house meet.
Returning to Bristol and studying the photos only increased our anxiety. Ten days later, we met the design team and the contractor on site to discuss this, by which time there were other timbers in place and we could see that the offending "stringer" beam wouldn't, in fact, be too visually intrusive. Plus, there are some positives (as is often the case), in that the complicated geometry of the roof structures which meet at this point means that there will be some very interesting, sculpted plastered shapes at ceiling height.
Thursday, 20 August 2009
Rain, rain go away
Actually, even though it's delayed the build, we can't grumble about the rain. It'll keep the aqifers nicely topped up.
Peter went to a site meeting on 14th August and sent me a message saying that the first sight of the timber frame in place was incredibly moving. The photo shows the view he had as he entered the site. The outlines of the upstairs rooms are emerging.
The meeting covered all sorts of details, including the passive venting system, external taps and drains, the balustrade to the front terrace, whether or not we want access panels for the plumbing of sanitaryware (no, thanks), how we'd like the floor to be finished, how the woodburner flue will get safely through the roof, where the warning/alarm light for the sewage treatment plant will go (don't ask; I didn't), how we will get electricity to the garage when we build it, etc etc. I keep thinking of my father, evening after evening, poring over drawings for the house he was building. As a child, I used to wonder why he found it all so interesting. Now, I realise, it must be in the blood.
The windows and doors have arrived at the builders' yard in Barnstaple, after a confused Latvian driver tried to deliver them to the British agent's premises, somewhere in Essex.
The really exciting July/August development is that we have decided upon a worktop for the kitchen and from that, Nathan can complete the kitchen design he'd proposed. The timber he sourced is from an oak tree felled 20 years ago and planked. The wood has been stored level and dry since then. The tree was about 250 years old and was in King John's parkland to the east of Bristol (hence "Kingswood"), reputedly giving the monarchs a clear route right through to London, without leaving their own estate lands. It is a "burr" oak; a most unusual growth and this ancient tree is going to provide a unique and beautiful work surface. I have to say that I was distinctly underwhelmed at the sight of the dusty, grimy planks but Nathan, his joiner and Peter persuaded me that it'll glow and that the revealed patterns will be really interesting once it's planed and finished.
The first fix electrics have been delayed, which is just as well, as there have been several frustrating attempts to get the wiring accurately on to the master drawings. Two sets of original, marked up drawings got lost in the post between Bristol and the electrician in Barnstaple. However, we have every faith in the electrician, who reassuringly says he won't do anything until he's sure we're absolutely happpy with it. The work can't start until the roof is felted and battened.